Contents |
Keynote Address Tribute to Tom Paulay Session 3 Session 4A Session 4B Session 5A Session 5B Session 6 Session 7A Session 7B Session 8A Session 8B Poster Session L’Aquila earthquake 2009: reconstruction between temporary and definitiveG.M. Calvi This paper describes the reconstruction intervention after the L’Aquila earthquake of April 6, 2009. Approximately 4,500 apartments were built in 8 months, all in buildings isolated by friction pendulum bearings (more than 7,000 devices were employed). The main aspects related to the logic developed to operate in such a tight time are briefly addressed, with particular reference to structural choices and response of the isolated buildings. Paper P01: [Read] Keynote Address Tribute to Tom Paulay Session 3 Session 4A Session 4B Session 5A Session 5B Session 6 Session 7A Session 7B Session 8A Session 8B Poster Session |